Last week, Method wrapped up factory construction on a 2,310 square foot custom prefab structure that will be set in Venice Beach. The four-bedroom, three-bathroom home is comprised of four modules and has numerous energy efficient features, including a grey water system, solar PV array and solar hot water systems, and hydronic radiant heat. The home took two and a half months to build to 95% completion in the factory.Simultaneous planning as the home is being built allows for construction at the site to be simplified. The owners of this architectural custom prefab home will have a timeline from design to occupancy that is two-thirds that of a custom site-built home.