Method Prefab built the 21-module annex for Seattle’s Taproot Theatre Company that was installed in the beginning of April. Four months later, the 12,000 square foot project designed by The Miller Hull Partnership is slated for completion and will open its doors for the Fall, possibly with the official public opening in time for their December show.As of this week, interiors are nearly finished, with railings being put on the steel and glulam wood tread staircase and completion of the new scene shop. Cross-bracing has been installed on the front exterior and the the dark gray sil-leed siding on the bottom half of the South facing façade will follow. Pictures in the gallery above show the lobby with a tongue and groove accent ceiling, the installed chestnut orange cladding, detail of the new staircase, and the 85th street view of the theatre prior to cross bracing and lower siding being installed. We will continue to update on progress as we turn the corner to completion and keep you posted on Taproot's plans for unveiling their new space.